Macleans College Science
Auckland / December 2019
The demolition and re-build of the Macleans Science and Technology Block is a 3 stage project. Stage 1 involved the demolition of the existing asbestos clad, leaking facilities, and construction of the new 800m2 Food and Technology Block. In total, this block consisted of seven new teaching spaces made up of a food tech room, computer teaching space, wood and metal working rooms with welding bays. Once completed, C3 was responsible for the relocation of the existing machinery, fittings, and fixtures, which had to be transferred from the old to the new block during the school holiday period to ensure continuity for Macleans College students. Stage 1 of this project involved significant challenges such as working within a live school environment, removing asbestos and contaminated ground, tight working areas, and detailed delivery management to ensure no downtime or disruptions during schooling, especially during specific periods of time i.e., Cambridge Exams.
Project Details
Status
Completed 2022
Use
Macleans College Science and Tech Block Redevelopment
C3 Staff Involved
Director

Kirk Bakker
Senior Quantity Surveyor (Auckland)

Jamie Leach
Director

Michael Bowman